Hewden supply many of the largest and most complex infrastructure projects undertaken in the UK whether it be Cross rail, Thames gateway, Motorway widening or the build for the Olympic games.
With a range of large excavators all available with operators, the Hewden 14ton to 20ton range are well utilised in the construct of infrastructure projects, whether they be compact radius or long reach we have the right machine for the right job.
Aligned with our range of Thwaites swivel or straight tip dumpers to 10 ton and site essentials such as fuel and Water bowsers Hewden has the fleet to deliver a comprehensive infrastructure offer, safely, to contractors working in what can be restrictive and challenging scenarios.
Once the groundwork is complete and the substructures for bridges need to be lifted into place Hewden can call on a fleet of Demag cranes to work with you to either contract lift where we take responsibility for the lift or under CPA conditions to ensure the lift is completed safely and on time.
As the work for cabling and piping commences a range of JCB 3CX machines or Caterpillar 432s can be employed to efficiently and effectively execute the task.
View Infrastructure Case Study Movie...
(9.66Mb WMV Format)
View Utilities Case Study Movie...
(8.56Mb WMV Format)
